How do I reassign Preventative Maintenance tasks?

Avatar
{Matthew Gillen}
Follow

Preventive Maintenance tasks can be reassigned individually or in bulk to assign or redistribute work. The following steps illustrate how to reassign current active tasks to a new assignee. To reassign future scheduled tasks please utilize the Equipment Task List.

 

To reassign from the PM Task List. 

  1. Click GO TO > PREVENTATIVE MAINTENANCE > PM TASK LIST.
  2. Select the check boxes to the left of the PM Task (or group of PM Tasks) to be reassigned.
  3. Click the Actions drop-down and select Reassign:
  4. In the dialog box, select the appropriate assignee, notification method, and add a message if applicable.                                     
  5. Click SAVE.

 

 

To reassign from within a specific PM Task:

  1. Click GO TO > PREVENTATIVE MAINTENANCE > PM TASK LIST.
  2. Click the specific PM Task's Request Number to be brought to the task page.
  3. Click REASSIGN
  4. In the dialog box, select the appropriate assignee, notification method, and add a message if applicable.
  5. Click SAVE.

 

 

To reassign a bulk group of PM Tasks:

  1. Click Go To > Preventive Maintenance > PM Task Reassign:
    1. Option 1 – assign all PM tasks from one engineer to another engineer.
    2. Option 2 – assign all PM tasks for a specific piece of equipment or equipment category to a specific engineer.

Comments

0 comments
Article is closed for comments.
Powered by Zendesk