Preventive Maintenance tasks can be reassigned individually or in bulk to assign or redistribute work. The following steps illustrate how to reassign current active tasks to a new assignee. To reassign future scheduled tasks please utilize the Equipment Task List.
To reassign from the PM Task List.
- Click GO TO > PREVENTATIVE MAINTENANCE > PM TASK LIST.
- Select the check boxes to the left of the PM Task (or group of PM Tasks) to be reassigned.
- Click the Actions drop-down and select Reassign:
- In the dialog box, select the appropriate assignee, notification method, and add a message if applicable.
- Click SAVE.
To reassign from within a specific PM Task:
- Click GO TO > PREVENTATIVE MAINTENANCE > PM TASK LIST.
- Click the specific PM Task's Request Number to be brought to the task page.
- Click REASSIGN:
- In the dialog box, select the appropriate assignee, notification method, and add a message if applicable.
- Click SAVE.
To reassign a bulk group of PM Tasks:
- Click Go To > Preventive Maintenance > PM Task Reassign:
- Option 1 – assign all PM tasks from one engineer to another engineer.
- Option 2 – assign all PM tasks for a specific piece of equipment or equipment category to a specific engineer.