Unscheduled tasks may be used to document unplanned repair work performed on a piece of equipment during the course of other maintenance. Unscheduled tasks may be added from an open PM task, or from an equipment record.
- To add an unscheduled task from an open task, click Add Unscheduled:
- Enter a Name for the task, select an Assignee, enter the number of days allotted to complete the work, and add any additional notes describing the work to be done:
- Click SAVE and a confirmation dialog will appear with a unique Task number.
- The new Task can now be located on the PM Tasks page.